
Articles
Prefabricating ceiling and bathroom wall heating panels
Prefabricating ceiling and bathroom wall heating panels
We all know how effective and cost saving prefabrication can be, so here is a suggestion for heating grids to be fitted to standard size dry lining panels and once fittedĀ linked up to the distribution piping in the apartment using push fit or press fit connectors.
Panels of heating grid are a standard n manufacture to fit with the standard dry line panels the heating grids can be pressure tested before installation.
An approximation of the amount of heating panels in an apartment would be 20% less than the total apartment area in Square metres.
As the system is only required to operate at a temperature of 30 Degrees C there is no expansion movement.
At this temperature it is the same us underfloor so has the ability to be linked in with under floor if required.
All of these suggestions can be operated using traditional heat producing plant or heat pumps.
CTSL an eco- conscious company